How to Operate a 4×8 Part 1: Getting Ready for Operation
My layout is far from finished, but I love operation so much that as soon as some track was laid, I started operating. Use this as reference. the track in the lower right leads to staging. The first step is to fill out a switchlist for the 2 locals, D11 and D13. the switchlist was […]
Read More How to Operate a 4×8 Part 1: Getting Ready for Operation